Page 1 of 1
Change the date
Posted: Sun Mar 02, 2008 7:22 am
by Julius
Is there a way to change the date on the iBike data that I downloaded? I rode today and realized the date set on my iBike was for last year and now I can't assign it on the correct day on Training Peaks WKO+ software.
Thanks,
Julius
Re: Change the date
Posted: Sun Mar 02, 2008 11:10 am
by Site_Admin
Actually, you should be able to do it through WKO+ pretty easily. Just import the file, then click on the "workout date", press the drop-down arrow, and switch to the date you want. Then click on the floppy disk icon to save the file, and you're done.
Re: Change the date
Posted: Sun Mar 02, 2008 4:35 pm
by Julius
Thank you.
Julius
Re: Change the date
Posted: Sun Mar 02, 2008 6:36 pm
by travispape
Julius wrote:Is there a way to change the date on the iBike data that I downloaded? I rode today and realized the date set on my iBike was for last year and now I can't assign it on the correct day on Training Peaks WKO+ software.
Thanks,
Julius
Like Richard said, you can change the date in WKO+. There is actually a way to do it in iBike 2 also, but it's in a slightly odd place: "Tools -> Set Weather". (The old iBike FW did not used to download temperature and pressure and by getting the time stamp right you could get the weather from the web.)
Travis